Newest
Ensuring Reliable Heater Operation
Views 4Replies 0
Original Post
09-27 11:43
IP Location 江苏常州 电信
Prevent internal dust at design stage, improve control-cabinet ventilation so the ambient stays ≤25°C (SCR over-temp trips above 70°C), and patrol the heater body and cabinet daily, comparing with historical data to find hidden faults early.


