Ensuring Reliable Heater Operation

 
Views 4Replies 0 Original Post 09-27 11:43 IP Location 江苏常州 电信

Prevent internal dust at design stage, improve control-cabinet ventilation so the ambient stays ≤25°C (SCR over-temp trips above 70°C), and patrol the heater body and cabinet daily, comparing with historical data to find hidden faults early.

Dislike 0ReportFavorite 0Tip 0