• Info
  • Details
  • Contact
  • Related
Send InquiryShare Supply Category Channel
1/5
SigporeWasteTreatment project / 1

SigporeWasteTreatment project

2022-05-19 16:10250Inq
Price Call for price
From Jiangsu苏州市Pre-order, Ship in 30Days  
Brand waste treatment project
Out of Stock
Product Details

This project with the treatment capacity of 600t/d is set for a fine sorting of MSW before they were sent to the CFB (circulating fluidized bed) for incineration. Specifically, JONO introduces the Lindner shredding technology and adopts two-stage shredding process in this project to shred the combustible materials into 80 mm fuel (SRF) so as to enhance the complete combustion rate and mitigate the pressure of treating the exhaust gas. Besides, the mechanical sorting process is also applied in this project to sort out ferromagnetic metals, in-combustibles (glass, stone, ash, etc.) and combustibles.

The first pilot plant at Singapore to treat the non-source sorted waste, it includes pre-treatment, bio-drying and post-treatment, within the pre-treatment, HDPE, LDPE,PP and MIX PET will be sorted out, the remains will be sent to bio-drying box, after 8-9days, the water content will be reduced from 45% to 25%. After the post treatment,ferrous, non-ferrous and inert could be separated. Eventually the calorific value of RDF will be increased from 1000kcal/kg to 3800kcal/kg, which could reach the EU standard Class III. This MBT plant is focusing on recycling and RDF production, a good reference case for the idea of “ waste to value”.

WITHIN THIS PLANT WE HAVE :


Report
Save 0
Comment 0
Contact
+Follow0

Suzhou jono Environmental Technology Co., LTD

VIP memberYear 4
Profile Unverified
Deposit Not Paid